Ground Sleeve Installation Guide

Detailed guide for properly installing your ground sleeve

Ground Sleeve Installation Guide

Proper ground sleeve installation ensures your flagpole's stability and longevity.

Materials Needed:

  • Ground sleeve (included with kit)
  • 2-3 bags of concrete mix
  • Post hole digger or shovel
  • Level (4-foot recommended)
  • Water source
  • Mixing container

Installation Steps:

1. Dig the Hole

  • Depth: 24-30 inches (1/3 of pole height)
  • Diameter: 12-14 inches
  • Shape: Straight sides, flat bottom

2. Position the Sleeve

  • Center sleeve in hole
  • Top should be 2-3 inches above ground
  • Use level to ensure perfectly vertical
  • Brace with wood stakes if needed

3. Mix and Pour Concrete

  • Follow concrete package directions
  • Pour in layers, tamping each layer
  • Keep checking level as you pour
  • Fill to within 2 inches of top

4. Finish and Cure

  • Slope concrete away from sleeve for drainage
  • Smooth surface with trowel
  • Allow 48 hours minimum cure time
  • Protect from rain during curing

Pro Tips:

  • Install on a dry, mild day
  • Have helper hold sleeve level while pouring
  • Take photos for future reference
  • Mark location before digging